- $44.7bn: net debt forecast for June 2029, a record. (BP3 2026-27)
- About $2bn a year in interest across the total public sector (2024-25). (ARSF 2024-25)
- +83%: Metronet like-for-like, $3bn to $5.5bn. (ABC)
- $4.7bn → $7.2bn: Westport's estimate from 2020 to 2024, which excludes the road and rail upgrades it needs. (The Age)
- +29,707 FTE (+26.8%) in the public sector in six years. (PSC)
Findings
1. Debt bottomed out in 2023 and is heading for a record
- Fact: Total public sector net debt was $31.96bn at June 2017 (ARSF 2016-17), fell to $27.4bn at June 2023 (ARSF 2022-23), and was $33.4bn at June 2026 (ARSF 2025-26 media statement). The Budget forecasts $40.26bn (2027), $43.33bn (2028), $44.68bn (2029) and $43.99bn (2030, 8.9% of GSP) (BP3).
- Fact: The June 2026 figure was $5.6bn below the original Budget forecast, mainly because of "timing changes in grants and contract payments". $1.4bn of the surplus went to the Building Hospitals Fund (media statement).
- Fact: Interest in 2024-25 was $1,750m ("other interest") plus $255m in lease interest across the non-financial public sector, and $1,017m in the general government sector alone (ARSF 2024-25). Budget interest-rate assumptions rise from 3.6% (2024-25) to 4.7% (2029-30) (BP3).
- Our read: "Below forecast" here means spending was delayed. The debt is deferred, not avoided. Debt is forecast to rise about $17.3bn from June 2023 to June 2029, despite eight surpluses in a row. Note: figures before 2020 are not strictly comparable because of the AASB 16 lease accounting change.
2. Metronet: the like-for-like cost rose 83%
- Fact: On the Minister's own like-for-like figures, Metronet rose from $3bn to $5.5bn (+83%). Thornlie–Cockburn more than doubled to $1.1bn (ABC, Apr 2024). Byford rose from $797m to $1.33bn (+67%) (ABC, Oct 2025).
- Fact: An ABC analysis of budget papers found about $4.7bn in price increases from when each project first entered the budget. About $3bn more is still to come for high-capacity signalling and ferries (ABC, Feb 2026).
- Our read: The headline program grew partly because scope was added. That's why we lead with the like-for-like 83% rather than the total.
3. Major projects routinely run over budget
- Fact: The Auditor General's 2023 review found 20 major projects rose from $8.7bn to $10.7bn (about +23%). 14 went over budget, and 4 of those by more than 100% (OAG 2023).
- Fact: Westport's 2020 estimate was $4.7bn. The 2024 business case was $7.2bn in today's dollars, excluding the required road and rail upgrades (The Age; ABC; business case summary).
- Our read: The full public cost of Westport is materially above $7.2bn once the excluded road and rail work is counted.
4. The public payroll grew almost twice as fast as the population
- Fact: Public sector FTE rose from 110,972 (2018-19) to 140,679 (2024-25), up 29,707 or 26.8%. The two fastest years were the most recent: +4.5% and +5.5% (PSC 2022-23; PSC 2024-25).
- Fact: Population grew 14.5% over the same years (2,659,625 to 3,045,000) (ABS; .id). That means FTE per 1,000 residents went from 41.7 to 46.2.
- Fact: About 74% of headcount growth from 2020-21 to 2024-25 was in Health and Education (PSC 2024-25).
- Our read: The state grew faster than the population it serves. Much of the growth is frontline, so the question is whether services improved to match. The government doesn't publish an administration-versus-frontline split.
5. Consultant reporting rule rescinded
- Fact: Premier's Circular 2025/17 required agencies to report consultants engaged at $50k or more every six months. The DPC rescinded-circulars list records it as "Rescinded on 24/03/2026". We found no replacement in the current list (rescinded list; current circulars).
- Fact: That reporting only ever covered "strategic advice". Engineering, project management, IT, accounting and publicity contracts were excluded (QoN 6028, 2020).
- Our read: Less reporting on a narrow measure means even less visibility. Why was the rule dropped, and what replaced it?
What we'd do: an Honest Numbers Act
- Publish the original and current cost and completion date of every project over $100m in every Budget.
- Create a Parliamentary Budget Office to cost election promises before polling day.
- Set a surplus rule: a fixed share of every surplus goes to paying down debt or cutting taxes, not to special-purpose funds.
- Report public sector headcount every year, split between frontline and administration.
- Restore and widen consultant and contractor reporting, published online, not just "may be tabled".